2025 BMW M3 Competition at Northside Imports Houston
https://fiat.dealerleads.com/cars/Used/2025/BMW/M3/Competition/165535522025 BMW M3 Competition
Selling Price : $80,500
Automobile Photos
Vehicle Basics
Additional Incentives
- Condition : Used
- Mileage : 7,170
- VIN : WBS23HJ01SFU55672
- Stock # : FP6128
- Engine : Twin Turbo Premium Unleaded I-6 3.0 L/183
- Transmission : 8-Speed Automatic w/OD
- Ext. Color : Sao Paulo Yellow
- Int. Color : Yas Marina Blue/Black
- Vehicle Type : 4dr Car
- Body Style : 4dr Car
- Drivetrain : RWD
City MPG *
16
Hwy MPG *
23
*Actual MPG rating will vary with options, driving conditions, habits and vehicle condition.
Apple CarPlay & Android Auto Compatibility, Automatic temperature control, BMW Curved Display w/HUD, Connected Package Pro, Executive Package, Extended Merino Leather Upholstery, Exterior Parking Camera Rear, Full LED Headlights w/Cornering Lights, Fully automatic headlights, harman/kardon Surround Sound System, Heated Steering Wheel, Memory seat, Navigation System, Parking Assistance Package, Parking Assistant Plus, Power Tailgate, Rain sensing wipers, Remote Engine Start.Priced below KBB Fair Purchase Price! Clean CARFAX.We are dedicated to making the car buying process as easy as possible for our customers. With outstanding customer services, Northside Imports Houston is your premier FIAT, Alfa Romeo, and Maserati dealer in the Spring, Houston, Katy, and Sugar Land areas. When you are looking to buy a new or used vehicle, we have a lot of information for you to help you make your decision. From financing information to research on all of the new car models we sell, there's something for everyone on our site. If you still have questions, don't hesitate to send us an email or contact us and our dedicated team will be glad to help you out. When you have found something you are interested in please feel free to get a price quote, evaluate your trade, apply for credit, or even save money by checking out our new car specials or used car specials. If you need service, our certified service technicians are ready to help you take care of your car so it lasts as long as you need it to. We also have a fully stocked parts department with genuine FIAT, Alfa Romeo, and Maserati parts and accessories. Our staff is eager to assist you. Come see us today!
Dealership Info
Northside Imports Houston
Northside Imports Houston
Northside Imports Houston
Vehicle Features
- Navigation
- Navigation System
- Connected Package Pro
- Executive Package
- Parking Assistance Package
- 16 Speakers
- AM/FM radio: SiriusXM
- harman/kardon Surround Sound System
- harman/kardon® Speakers
- Radio data system
- Radio: AM/FM Audio System
- SiriusXM w/360L & 1 Year Platinum Plan Subscription
- Air Conditioning
- Automatic temperature control
- Front dual zone A/C
- Rear air conditioning
- Rear window defroster
- Lumbar Support
- Memory seat
- Power driver seat
- Power steering
- Power windows
- Remote Engine Start
- Remote keyless entry
- Steering wheel mounted audio controls
- Adaptive suspension
- Four wheel independent suspension
- Speed-sensing steering
- Traction control
- 4-Wheel Disc Brakes
- ABS brakes
- Dual front impact airbags
- Dual front side impact airbags
- Emergency communication system: BMW Assist eCall
- Front anti-roll bar
- Knee airbag
- Low tire pressure warning
- Occupant sensing airbag
- Overhead airbag
- Rear anti-roll bar
- Power Tailgate
- Brake assist
- Electronic Stability Control
- Exterior Parking Camera Rear
- Auto High-beam Headlights
- Delay-off headlights
- Fully automatic headlights
- Panic alarm
- Security system
- Speed control
- Auto-dimming door mirrors
- Bumpers: body-color
- Full LED Headlights w/Cornering Lights
- Heated door mirrors
- M Shadowline Lights
- Parking Assistant Plus
- Power door mirrors
- Spoiler
- Turn signal indicator mirrors
- Apple CarPlay & Android Auto Compatibility
- Auto-dimming Rear-View mirror
- BMW Assist eCall
- BMW Curved Display w/HUD
- BMW TeleServices
- Compass
- ConnectedDrive Services
- Drive Recorder
- Driver door bin
- Driver vanity mirror
- Front reading lights
- Galvanic Controls
- Garage door transmitter
- Heated Steering Wheel
- Illuminated entry
- Outside temperature display
- Passenger vanity mirror
- Rear reading lights
- Sport steering wheel
- Tachometer
- Telescoping steering wheel
- Tilt steering wheel
- Trip computer
- Wireless Device Charging
- Extended Merino Leather Upholstery
- Front Bucket Seats
- Front Center Armrest
- Heated Front Seats
- Heated front seats
- M Sport Seats
- Power Front Seats
- Power passenger seat
- Split folding rear seat
- Passenger door bin
- Alloy wheels
- Wheels: 19x9.5 Fr. & 20x10.5 Rr M Black
- Wheels: 19x9.5 Fr.&20x10.5Rr. M Bi-color (1T8)
- Rain sensing wipers
- Speed-Sensitive Wipers
- Variably intermittent wipers
- SAO PAULO YELLOW
- YAS MARINA BLUE/BLACK EXTENDED MERINO LEATHER UPHOLSTERY
- WiFi Hotspot
- Smart Device Integration
- Turbocharged
- Rear Wheel Drive
- Active Suspension
- Power Steering
- ABS
- 4-Wheel Disc Brakes
- Brake Assist
- Locking/Limited Slip Differential
- Aluminum Wheels
- Tires - Front Performance
- Tires - Rear Performance
- Heated Mirrors
- Power Mirror(s)
- Integrated Turn Signal Mirrors
- Power Folding Mirrors
- Rear Defrost
- Intermittent Wipers
- Variable Speed Intermittent Wipers
- Rain Sensing Wipers
- Rear Spoiler
- Power Door Locks
- Daytime Running Lights
- Automatic Headlights
- Headlights-Auto-Leveling
- LED Headlights
- Automatic Highbeams
- AM/FM Stereo
- Satellite Radio
- HD Radio
- Requires Subscription
- MP3 Capability
- Steering Wheel Audio Controls
- Auxiliary Audio Input
- Satellite Radio
- Requires Subscription
- Premium Sound System
- Bluetooth Connection
- Bucket Seats
- Power Driver Seat
- Power Passenger Seat
- Heated Front Seat(s)
- Pass-Through Rear Seat
- Rear Bench Seat
- Adjustable Steering Wheel
- Trip Computer
- Power Windows
- Leather Steering Wheel
- Keyless Entry
- Power Door Locks
- Keyless Start
- Keyless Entry
- Power Door Locks
- Hands-Free Liftgate
- Universal Garage Door Opener
- Cruise Control
- Climate Control
- Multi-Zone A/C
- A/C
- A/C
- Rear A/C
- Leather Seats
- Auto-Dimming Rearview Mirror
- Driver Vanity Mirror
- Passenger Vanity Mirror
- Driver Illuminated Vanity Mirror
- Passenger Illuminated Visor Mirror
- Floor Mats
- Mirror Memory
- Seat Memory
- Keyless Start
- Navigation System
- Telematics
- Requires Subscription
- WiFi Hotspot
- Smart Device Integration
- Power Windows
- Power Door Locks
- Trip Computer
- Navigation System
- Driver Adjustable Lumbar
- Passenger Adjustable Lumbar
- Security System
- Immobilizer
- Traction Control
- Stability Control
- Traction Control
- Front Side Air Bag
- Rear Parking Aid
- Blind Spot Monitor
- Cross-Traffic Alert
- Rear Collision Mitigation
- Lane Departure Warning
- Front Collision Mitigation
- Driver Monitoring
- Tire Pressure Monitor
- Driver Air Bag
- Passenger Air Bag
- Front Head Air Bag
- Rear Head Air Bag
- Passenger Air Bag Sensor
- Knee Air Bag
- Child Safety Locks
- Back-Up Camera
Disclaimer & Legal Info
Prices do not include additional fees and costs of closing, including government fees and taxes, any finance charges, any dealer documentation fees, any emissions testing fees or other fees. All prices, specifications and availability subject to change without notice. Contact dealer for most current information. Prices are valid thru the close of business, today only.